Proposed covered walkway shelter and upgraded footpath and gate entrance at Hobson Memorial. Earthworks and infrastructure within 20m of the heritage feature and within a site containing a scheduled heritage resource. The proposed activity is Permitted under the Operative District Plan (ODP). A Discretionary Activity
resource consent under the Proposed District Plan (PDP) is required for works within 20m of a scheduled heritage resource and infrastructure (stormwater) within a site containing a scheduled
heritage resource.