Construction of a new ambulance bay/garage with covered walkways connecting the Medical Centre Emergency Department and St John’s Operations Centre. Works include an accessible entry ramp to St John’s, an extension to the Medical Centre with new consulting rooms and staff facilities, and a new covered accessible ramp and stair at the main entry