| Proposal |
TotalSpan shed in the Rural Production Zone The proposal is a Restricted Discretionary Activity under the Proposed District Plan. It is a Discretionary Activity under the Operative District Plan, because the site’s impermeable
surface coverage (28.2%) exceeds the Operative Plan’s 20% Controlled Activity threshold (Rule
8.6.5.2.1). |